MBA are retained as Ocado’s consultant to perform design and monitoring for the M&E, Sprinkler, Refrigeration & insulated structure installations.
Based in Purfleet, Ocado’s fifth Customer Fulfilment Centre (CFC) will sit on the entire 19-acre site, which is located inside the M25 alongside the A13. The unit at SEGRO Logistics Park Purfleet will combine the space, power and connectivity to house Ocado’s cutting-edge, robotic packing operation, along with a BREEAM Excellent sustainability rating.
The CFC commenced operations at the end of last year and has a capability of satisfying 30,000 orders per week and features the latest Ocado IT systems.