We were delighted to be appointed once again as Ocado’s consultant for the new CFC located in Purfleet. The Ocado’s fifth Customer Fulfilment Centre (CFC) occupies the entire 19-acre site, which is located inside the M25 alongside the A13.
The unit at SEGRO Logistics Park Purfleet combines the space, power and connectivity to house Ocado’s cutting-edge, robotic packing operation, achieving a BREEAM Excellent sustainability rating.
Due to our extensive knowledge of the Ocado operation we were appointed to perform enhanced design and monitoring for the Mechanical & Electrical, Sprinkler, Refrigeration & Insulated Structure installations.
Our compliance team were responsible for monitoring and checking the quality of works on site along with commissioning & testing for services to ensure that the building had full functionality to the required design parameters.