We were delighted to be appointed once again as Ocado’s consultant for the new Multi Temperature CFC located in Dordon. Based on the Birch Coppice Business Park, the five-storey CFC features the latest Ocado IT systems & technology.
We were appointed to perform enhanced design and monitoring for the Mechanical & Electrical, Sprinkler, Refrigeration & Insulated structures installations.
The project was executed on a shell and fit-out basis, with MBA involved from concept to completion to ensure that all of the building services requirements were fully integrated with the high technology automation system[s], which included conveyors, MASSOPS, mini-load and high bay cranes together with an ASRS system.
Our compliance team were responsible for monitoring and checking the quality of works on site along with commissioning & testing for services to ensure that the building had full functionality to the required design parameters.